Bilfinger VAM Anlagentechnik GmbH

Navigation

Hydropower

From the Workshop into the Rock

Penstock and tunnel armoring are the most important components when erecting hydroelectric plants in a country as mountainous as Austria.

For many decades, Bilfinger VAM has been a competent and reliable partner in the construction of hydropower plants. The prefabricated components are transported to the site where they are erected by our highly qualified professionals, sometimes under extremely difficult conditions. It might happen that erection is possible only by means of a ropeway, an inclined lift or a helicopter.

Calculation, design, and manufacture of sophisticated branches, distributing conduits, trash racks, different kinds of stop valves such as emergency stop sliding valves, bottom outlet slide valves in artificial lakes, retaining weirs etc. is done at the plant in Wels.

Stephan Ebner

Stephan Ebner

Head of the business division
Hydropower

Phone: +43 (7242) 406-379
Fax: +43 (7242) 4067-379