Bilfinger VAM Anlagentechnik GmbH

Navigation
References Engineering Assembly and Erection

References Engineering Assembly and Erection

Place for the big image

Commerzbank Arena

Deutschland

Bilfinger Berger betreibt...
Place for the small images

HEPP Limmern / Austria

HEPP Limmern / Austria show reference
HEPP Limmern

Scope of engineering:

Basic and detail engineering
- mounting devices
- Assembly dolly
- lifting beam
- hydraulic pressure test

Installation and erection studies
Design of the erection concept
Detail engineering
Structural analysis
Production monitoring
Documentation

Technical data:
Transport cableway                                    1050m vertical height
Transport gallery                                        approx. 5km long tunnel system
hydraulic pressure test                               114 bar
total weight at pressure test                        approx. 290 to (incl. water)

 

Client: Axpo Kraftwerke Linth-Limmern AG

Project duration: 01/2013 to 05/2015

HEPP Limmern

Scope of engineering:

Basic and detail engineering
- mounting devices
- Assembly dolly
- lifting beam
- hydraulic pressure test

Installation and erection studies
Design of the erection concept
Detail engineering
Structural analysis
Production monitoring
Documentation

Technical data:
Transport cableway                                    1050m vertical height
Transport gallery                                        approx. 5km long tunnel system
hydraulic pressure test                               114 bar
total weight at pressure test                        approx. 290 to (incl. water)

 

Client: Axpo Kraftwerke Linth-Limmern AG

Project duration: 01/2013 to 05/2015

HEPP Limmern

Scope of engineering:

Basic and detail engineering
- mounting devices
- Assembly dolly
- lifting beam
- hydraulic pressure test

Installation and erection studies
Design of the erection concept
Detail engineering
Structural analysis
Production monitoring
Documentation

Technical data:
Transport cableway                                    1050m vertical height
Transport gallery                                        approx. 5km long tunnel system
hydraulic pressure test                               114 bar
total weight at pressure test                        approx. 290 to (incl. water)

 

Client: Axpo Kraftwerke Linth-Limmern AG

Project duration: 01/2013 to 05/2015

HEPP Limmern

Scope of engineering:

Basic and detail engineering
- mounting devices
- Assembly dolly
- lifting beam
- hydraulic pressure test

Installation and erection studies
Design of the erection concept
Detail engineering
Structural analysis
Production monitoring
Documentation

Technical data:
Transport cableway                                    1050m vertical height
Transport gallery                                        approx. 5km long tunnel system
hydraulic pressure test                               114 bar
total weight at pressure test                        approx. 290 to (incl. water)

 

Client: Axpo Kraftwerke Linth-Limmern AG

Project duration: 01/2013 to 05/2015

 

HEPP Belesar - Rehabilitation Penstock - erection devices

HEPP Belesar - Rehabilitation Penstock - erection devices show reference
HEPP Belesar - Rehabilitation Penstock - erection devices

Scope of engineering:

Basic and detail engineering
- Dismantling vehicle
- Drilling vehicle for the installation of the pressure relief valves
- Transportation vehicle for the penstock components
- Assembly station

Installation and erection studies
Design of the erection concept
Detail engineering
Structural analysis
Production monitoring
Documentation

Technical data:
Dismantling vehicle:
Load                                              max. 4,5 t
Pipe Diameter                               up to 4000 mm
Pipe Length                                   max. 6000 mm

Drilling vehicle for the installation of the pressure relief valves:
Inclination of the penstock            max. 41°
Total working distance                  180m

Assembly station:
Pipe Diameter                               up to 4000 mm
Pipe Length                                   max. 3500 mm

 

Client: Gas Natural Fenosa

Project duration: 02/2011 to 02/2012

HEPP Belesar - Rehabilitation Penstock - erection devices

Scope of engineering:

Basic and detail engineering
- Dismantling vehicle
- Drilling vehicle for the installation of the pressure relief valves
- Transportation vehicle for the penstock components
- Assembly station

Installation and erection studies
Design of the erection concept
Detail engineering
Structural analysis
Production monitoring
Documentation

Technical data:
Dismantling vehicle:
Load                                              max. 4,5 t
Pipe Diameter                               up to 4000 mm
Pipe Length                                   max. 6000 mm

Drilling vehicle for the installation of the pressure relief valves:
Inclination of the penstock            max. 41°
Total working distance                  180m

Assembly station:
Pipe Diameter                               up to 4000 mm
Pipe Length                                   max. 3500 mm

 

Client: Gas Natural Fenosa

Project duration: 02/2011 to 02/2012

HEPP Belesar - Rehabilitation Penstock - erection devices

Scope of engineering:

Basic and detail engineering
- Dismantling vehicle
- Drilling vehicle for the installation of the pressure relief valves
- Transportation vehicle for the penstock components
- Assembly station

Installation and erection studies
Design of the erection concept
Detail engineering
Structural analysis
Production monitoring
Documentation

Technical data:
Dismantling vehicle:
Load                                              max. 4,5 t
Pipe Diameter                               up to 4000 mm
Pipe Length                                   max. 6000 mm

Drilling vehicle for the installation of the pressure relief valves:
Inclination of the penstock            max. 41°
Total working distance                  180m

Assembly station:
Pipe Diameter                               up to 4000 mm
Pipe Length                                   max. 3500 mm

 

Client: Gas Natural Fenosa

Project duration: 02/2011 to 02/2012

HEPP Belesar - Rehabilitation Penstock - erection devices

Scope of engineering:

Basic and detail engineering
- Dismantling vehicle
- Drilling vehicle for the installation of the pressure relief valves
- Transportation vehicle for the penstock components
- Assembly station

Installation and erection studies
Design of the erection concept
Detail engineering
Structural analysis
Production monitoring
Documentation

Technical data:
Dismantling vehicle:
Load                                              max. 4,5 t
Pipe Diameter                               up to 4000 mm
Pipe Length                                   max. 6000 mm

Drilling vehicle for the installation of the pressure relief valves:
Inclination of the penstock            max. 41°
Total working distance                  180m

Assembly station:
Pipe Diameter                               up to 4000 mm
Pipe Length                                   max. 3500 mm

 

Client: Gas Natural Fenosa

Project duration: 02/2011 to 02/2012

Lifting beam for coiler / Austria

Lifting beam for coiler / Austria show reference
Lifting beam for coiler

Scope of engineering:

Basic and detail engineering
- lifting beam

Layout drawings
Supervision of manufacturing
Assistance at start-up tests
Documentation

Technical data:
weight coiler pillar                                  145 t
dimension coiler pillar                             6100 x 4800 x 5700 mm
main lift capacity lifting beam:                 max. 150 t
secondary lift capacity lifting beam:         max. 70 t
dimension lifting beam:                           5684 x 3229 x 1350 mm

Client: Siemens VAI

Project duration: 2009 to 2011

Lifting beam for coiler

Scope of engineering:

Basic and detail engineering
- lifting beam

Layout drawings
Supervision of manufacturing
Assistance at start-up tests
Documentation

Technical data:
weight coiler pillar                                  145 t
dimension coiler pillar                             6100 x 4800 x 5700 mm
main lift capacity lifting beam:                 max. 150 t
secondary lift capacity lifting beam:         max. 70 t
dimension lifting beam:                           5684 x 3229 x 1350 mm

Client: Siemens VAI

Project duration: 2009 to 2011

Lifting beam for coiler

Scope of engineering:

Basic and detail engineering
- lifting beam

Layout drawings
Supervision of manufacturing
Assistance at start-up tests
Documentation

Technical data:
weight coiler pillar                                  145 t
dimension coiler pillar                             6100 x 4800 x 5700 mm
main lift capacity lifting beam:                 max. 150 t
secondary lift capacity lifting beam:         max. 70 t
dimension lifting beam:                           5684 x 3229 x 1350 mm

Client: Siemens VAI

Project duration: 2009 to 2011

Song Lou Lou Exchange expanding pieces erection devices / Austria

Song Lou Lou Exchange expanding pieces erection devices / Austria show reference
Song Lou Lou Exchange expanding pieces erection devices

Scope of engineering:

Basic and detail engineering
- Dismantling
- Erection
- Expanding piece
- Sliding Device (Saddle)
- Gantry crane

Dismantling study
Design of the erection concept
Layout
Crane studies
Detail engineering
Structural analysis
Production monitoring
Documentation

Technical data:
Expanding piece                           Ø6.5 m, L=4 m, 16 t
Sliding Device (Saddle)                Load 16 to, 4.67 m x 4.41 m x 1.17 m
Gantry crane                                 Load capacity 18 to, Lifting height 20 m, Gauge 8.5m

 

Client: Andritz Hydro GmbH

Project duration: 11/2008 to 11/2010

Song Lou Lou Exchange expanding pieces erection devices

Scope of engineering:

Basic and detail engineering
- Dismantling
- Erection
- Expanding piece
- Sliding Device (Saddle)
- Gantry crane

Dismantling study
Design of the erection concept
Layout
Crane studies
Detail engineering
Structural analysis
Production monitoring
Documentation

Technical data:
Expanding piece                           Ø6.5 m, L=4 m, 16 t
Sliding Device (Saddle)                Load 16 to, 4.67 m x 4.41 m x 1.17 m
Gantry crane                                 Load capacity 18 to, Lifting height 20 m, Gauge 8.5m

 

Client: Andritz Hydro GmbH

Project duration: 11/2008 to 11/2010

Song Lou Lou Exchange expanding pieces erection devices

Scope of engineering:

Basic and detail engineering
- Dismantling
- Erection
- Expanding piece
- Sliding Device (Saddle)
- Gantry crane

Dismantling study
Design of the erection concept
Layout
Crane studies
Detail engineering
Structural analysis
Production monitoring
Documentation

Technical data:
Expanding piece                           Ø6.5 m, L=4 m, 16 t
Sliding Device (Saddle)                Load 16 to, 4.67 m x 4.41 m x 1.17 m
Gantry crane                                 Load capacity 18 to, Lifting height 20 m, Gauge 8.5m

 

Client: Andritz Hydro GmbH

Project duration: 11/2008 to 11/2010

Song Lou Lou Exchange expanding pieces erection devices

Scope of engineering:

Basic and detail engineering
- Dismantling
- Erection
- Expanding piece
- Sliding Device (Saddle)
- Gantry crane

Dismantling study
Design of the erection concept
Layout
Crane studies
Detail engineering
Structural analysis
Production monitoring
Documentation

Technical data:
Expanding piece                           Ø6.5 m, L=4 m, 16 t
Sliding Device (Saddle)                Load 16 to, 4.67 m x 4.41 m x 1.17 m
Gantry crane                                 Load capacity 18 to, Lifting height 20 m, Gauge 8.5m

 

Client: Andritz Hydro GmbH

Project duration: 11/2008 to 11/2010

 

HEPP Limberg II - mounting devices steel lining / Austria

HEPP Limberg II - mounting devices steel lining / Austria show reference
HEPP Limberg II - mounting devices steel lining

Scope of engineering:

Basic and detail engineering
- Pipe carrier
- Moveable working platform
- Layout of the pre-fabrication
- Erection planning for the cone elbow with surge shaft junction

Installation and erection studies
Design of the erection concept
Detail engineering
Structural analysis
Production monitoring
Hazard analysis
Documentation

Technical data:
Pipe carrier:
Working load                   max. 50 t
Pipe Diameter                  up to 4800 mm
Pipe Length                     max. 9000 mm

Moveable working platform
Inclination                        max. 45°
Course                             600 m

 

Client: Andritz Hydro GmbH

Project duration: 06/2007 to 12/2010

HEPP Limberg II - mounting devices steel lining

Scope of engineering:

Basic and detail engineering
- Pipe carrier
- Moveable working platform
- Layout of the pre-fabrication
- Erection planning for the cone elbow with surge shaft junction

Installation and erection studies
Design of the erection concept
Detail engineering
Structural analysis
Production monitoring
Hazard analysis
Documentation

Technical data:
Pipe carrier:
Working load                   max. 50 t
Pipe Diameter                  up to 4800 mm
Pipe Length                     max. 9000 mm

Moveable working platform
Inclination                        max. 45°
Course                             600 m

 

Client: Andritz Hydro GmbH

Project duration: 06/2007 to 12/2010

HEPP Limberg II - mounting devices steel lining

Scope of engineering:

Basic and detail engineering
- Pipe carrier
- Moveable working platform
- Layout of the pre-fabrication
- Erection planning for the cone elbow with surge shaft junction

Installation and erection studies
Design of the erection concept
Detail engineering
Structural analysis
Production monitoring
Hazard analysis
Documentation

Technical data:
Pipe carrier:
Working load                   max. 50 t
Pipe Diameter                  up to 4800 mm
Pipe Length                     max. 9000 mm

Moveable working platform
Inclination                        max. 45°
Course                             600 m

 

Client: Andritz Hydro GmbH

Project duration: 06/2007 to 12/2010

HEPP Limberg II - mounting devices steel lining

Scope of engineering:

Basic and detail engineering
- Pipe carrier
- Moveable working platform
- Layout of the pre-fabrication
- Erection planning for the cone elbow with surge shaft junction

Installation and erection studies
Design of the erection concept
Detail engineering
Structural analysis
Production monitoring
Hazard analysis
Documentation

Technical data:
Pipe carrier:
Working load                   max. 50 t
Pipe Diameter                  up to 4800 mm
Pipe Length                     max. 9000 mm

Moveable working platform
Inclination                        max. 45°
Course                             600 m

 

Client: Andritz Hydro GmbH

Project duration: 06/2007 to 12/2010

HEPP Limberg II - mounting devices steel lining

Scope of engineering:

Basic and detail engineering
- Pipe carrier
- Moveable working platform
- Layout of the pre-fabrication
- Erection planning for the cone elbow with surge shaft junction

Installation and erection studies
Design of the erection concept
Detail engineering
Structural analysis
Production monitoring
Hazard analysis
Documentation

Technical data:
Pipe carrier:
Working load                   max. 50 t
Pipe Diameter                  up to 4800 mm
Pipe Length                     max. 9000 mm

Moveable working platform
Inclination                        max. 45°
Course                             600 m

 

Client: Andritz Hydro GmbH

Project duration: 06/2007 to 12/2010

 

 

Adjustable platform for lining works / Austria

Adjustable platform for lining works / Austria show reference
Adjustable platform for lining works

Scope of engineering:

Basic and detail engineering
- adjustable platform

Development of concept & design
Layout
Detail engineering
Structural analysis
Production monitoring
Documentation

Technical data:
Load                                 4,6 t
Height of stroke               3500 mm
Platform dimension         D=4500 mm
Weight                             5 t

 

Client: VoestAlpine Stahl GmbH

Project duration: 09/2006 to 12/2006

Adjustable platform for lining works

Scope of engineering:

Basic and detail engineering
- adjustable platform

Development of concept & design
Layout
Detail engineering
Structural analysis
Production monitoring
Documentation

Technical data:
Load                                 4,6 t
Height of stroke               3500 mm
Platform dimension         D=4500 mm
Weight                             5 t

 

Client: VoestAlpine Stahl GmbH

Project duration: 09/2006 to 12/2006

Adjustable platform for lining works

Scope of engineering:

Basic and detail engineering
- adjustable platform

Development of concept & design
Layout
Detail engineering
Structural analysis
Production monitoring
Documentation

Technical data:
Load                                 4,6 t
Height of stroke               3500 mm
Platform dimension         D=4500 mm
Weight                             5 t

 

Client: VoestAlpine Stahl GmbH

Project duration: 09/2006 to 12/2006

Adjustable platform for lining works

Scope of engineering:

Basic and detail engineering
- adjustable platform

Development of concept & design
Layout
Detail engineering
Structural analysis
Production monitoring
Documentation

Technical data:
Load                                 4,6 t
Height of stroke               3500 mm
Platform dimension         D=4500 mm
Weight                             5 t

 

Client: VoestAlpine Stahl GmbH

Project duration: 09/2006 to 12/2006

 

HEPP Wallsee - spray up-device / Austria

HEPP Wallsee - spray up-device / Austria show reference
HEPP Wallsee - spray up-device

Scope of engineering:

Basic and detail engineering
- spray up-device

Design of the erection concept
Layout
Detail engineering
Structural analysis

Technical data:
Dimension of the platform            up to Ø3.9 m
Weight                                           2972 kg

 

Client: Andritz Hydro GmbH

Project duration: 09/2005 to 12/2005

HEPP Wallsee - spray up-device

Scope of engineering:

Basic and detail engineering
- spray up-device

Design of the erection concept
Layout
Detail engineering
Structural analysis

Technical data:
Dimension of the platform            up to Ø3.9 m
Weight                                           2972 kg

 

Client: Andritz Hydro GmbH

Project duration: 09/2005 to 12/2005

HEPP Wallsee - spray up-device

Scope of engineering:

Basic and detail engineering
- spray up-device

Design of the erection concept
Layout
Detail engineering
Structural analysis

Technical data:
Dimension of the platform            up to Ø3.9 m
Weight                                           2972 kg

 

Client: Andritz Hydro GmbH

Project duration: 09/2005 to 12/2005

HEPP Wallsee - spray up-device

Scope of engineering:

Basic and detail engineering
- spray up-device

Design of the erection concept
Layout
Detail engineering
Structural analysis

Technical data:
Dimension of the platform            up to Ø3.9 m
Weight                                           2972 kg

 

Client: Andritz Hydro GmbH

Project duration: 09/2005 to 12/2005

Natural gas high pressure pipeline Krift - Pyhrn / Austria

Natural gas high pressure pipeline Krift - Pyhrn / Austria show reference
Natural gas high pressure pipeline Krift - Pyhrn

Scope of engineering:

Basic and detail engineering
- equipment for the erection in the area of the water reservoir

Concept and erection planning
Layout
Detail engineering
Structural analysis
Documentation

Technical data:
Nominal diameter                                                     DN400
Operating pressure                                                   70 bar
Total length of the pipeline in the reservoir              approx. 3700 m

 

Client: OÖ Ferngas AG

Project duration: 08/1997 to 10/1997

Natural gas high pressure pipeline Krift - Pyhrn

Scope of engineering:

Basic and detail engineering
- equipment for the erection in the area of the water reservoir

Concept and erection planning
Layout
Detail engineering
Structural analysis
Documentation

Technical data:
Nominal diameter                                                     DN400
Operating pressure                                                   70 bar
Total length of the pipeline in the reservoir              approx. 3700 m

 

Client: OÖ Ferngas AG

Project duration: 08/1997 to 10/1997

Natural gas high pressure pipeline Krift - Pyhrn

Scope of engineering:

Basic and detail engineering
- equipment for the erection in the area of the water reservoir

Concept and erection planning
Layout
Detail engineering
Structural analysis
Documentation

Technical data:
Nominal diameter                                                     DN400
Operating pressure                                                   70 bar
Total length of the pipeline in the reservoir              approx. 3700 m

 

Client: OÖ Ferngas AG

Project duration: 08/1997 to 10/1997

HEPP Freudenau - Diffuser-Pipes / Austria

HEPP Freudenau - Diffuser-Pipes / Austria show reference
HEPP Freudenau - Diffuser-Pipes

Scope of engineering:

Basic and detail engineering
- Installation
- diffusers

Installation and erection studies
Design of the erection concept
Detail engineering
Structural analysis
Documentation

Technical data:
Nominal diameters                        DN2500 / 2200 / 1800 / 1400
Max. Length                                  approx. 120 m
Max. Single tube length                69,5 m
Max. Installation-weight                 approx. 65 to

 

Client: Verbund - Austrian Hydro Power AG

Project duration: 06/1995 to 12/1995

HEPP Freudenau - Diffuser-Pipes

Scope of engineering:

Basic and detail engineering
- Installation
- diffusers

Installation and erection studies
Design of the erection concept
Detail engineering
Structural analysis
Documentation

Technical data:
Nominal diameters                        DN2500 / 2200 / 1800 / 1400
Max. Length                                  approx. 120 m
Max. Single tube length                69,5 m
Max. Installation-weight                 approx. 65 to

 

Client: Verbund - Austrian Hydro Power AG

Project duration: 06/1995 to 12/1995

HEPP Freudenau - Diffuser-Pipes

Scope of engineering:

Basic and detail engineering
- Installation
- diffusers

Installation and erection studies
Design of the erection concept
Detail engineering
Structural analysis
Documentation

Technical data:
Nominal diameters                        DN2500 / 2200 / 1800 / 1400
Max. Length                                  approx. 120 m
Max. Single tube length                69,5 m
Max. Installation-weight                 approx. 65 to

 

Client: Verbund - Austrian Hydro Power AG

Project duration: 06/1995 to 12/1995