Commerzbank Arena

Deutschland

Bilfinger Berger betreibt...
Place for the small images

Wind Tunnel Mercedes component planning / Austria

Wind Tunnel Mercedes component planning / Austria Show Reference
Wind Tunnel Mercedes component planning

Scope of engineering:

 

Detail engineering
- „Adjustable collector“
- „Idle city flaps“
- „Flexible nozzle“
- „Moving turning vane“
- „Rain rig flap/door“
- „Steam grids“
- „Rain and snow simulation“

 

Creation of bill of materials
Static calculation of all components
Project management
Scheduling
Preparation of operating and maintenance manuals
Risk assessment and hazard analysis
Declaration of conformity for CE marking
Assembly and erection engineering
Production supervision
Commissioning
Operator training
Documentation
Maintenance

 

Client: Bilfinger MCE GmbH

 

Project duration: 04/2009 to 10/2009

 

 

 

Wind Tunnel Mercedes component planning

Scope of engineering:

 

Detail engineering
- „Adjustable collector“
- „Idle city flaps“
- „Flexible nozzle“
- „Moving turning vane“
- „Rain rig flap/door“
- „Steam grids“
- „Rain and snow simulation“

 

Creation of bill of materials
Static calculation of all components
Project management
Scheduling
Preparation of operating and maintenance manuals
Risk assessment and hazard analysis
Declaration of conformity for CE marking
Assembly and erection engineering
Production supervision
Commissioning
Operator training
Documentation
Maintenance

 

Client: Bilfinger MCE GmbH

 

Project duration: 04/2009 to 10/2009

 

 

 

Wind Tunnel Mercedes component planning

Scope of engineering:

 

Detail engineering
- „Adjustable collector“
- „Idle city flaps“
- „Flexible nozzle“
- „Moving turning vane“
- „Rain rig flap/door“
- „Steam grids“
- „Rain and snow simulation“

 

Creation of bill of materials
Static calculation of all components
Project management
Scheduling
Preparation of operating and maintenance manuals
Risk assessment and hazard analysis
Declaration of conformity for CE marking
Assembly and erection engineering
Production supervision
Commissioning
Operator training
Documentation
Maintenance

 

Client: Bilfinger MCE GmbH

 

Project duration: 04/2009 to 10/2009

 

 

 

Wind Tunnel Mercedes component planning

Scope of engineering:

 

Detail engineering
- „Adjustable collector“
- „Idle city flaps“
- „Flexible nozzle“
- „Moving turning vane“
- „Rain rig flap/door“
- „Steam grids“
- „Rain and snow simulation“

 

Creation of bill of materials
Static calculation of all components
Project management
Scheduling
Preparation of operating and maintenance manuals
Risk assessment and hazard analysis
Declaration of conformity for CE marking
Assembly and erection engineering
Production supervision
Commissioning
Operator training
Documentation
Maintenance

 

Client: Bilfinger MCE GmbH

 

Project duration: 04/2009 to 10/2009

 

 

 

Wind Tunnel Mercedes component planning

Scope of engineering:

 

Detail engineering
- „Adjustable collector“
- „Idle city flaps“
- „Flexible nozzle“
- „Moving turning vane“
- „Rain rig flap/door“
- „Steam grids“
- „Rain and snow simulation“

 

Creation of bill of materials
Static calculation of all components
Project management
Scheduling
Preparation of operating and maintenance manuals
Risk assessment and hazard analysis
Declaration of conformity for CE marking
Assembly and erection engineering
Production supervision
Commissioning
Operator training
Documentation
Maintenance

 

Client: Bilfinger MCE GmbH

 

Project duration: 04/2009 to 10/2009

 

 

POSCO Slide Gate / Austria

POSCO Slide Gate / Austria Show Reference
POSCO Slide Gate

Scope of engineering:

 Basic and detail engineering
- Multiple material slide gate
- slide gates
- hydraulic drive system
- refractory lining

Creation of bill of materials
Static calculation of all components
Project management
Scheduling
Preparation of operating and maintenance manuals
Assembly and erection engineering
Commissioning
Operator training
Documentation
 
Technical data:
Diameter inlet                     DN1600
Diameter outlet                   5x DN300
Length                                approx. 6200 mm (incl. hydraulic actuators)
Width                                 approx. 6200 mm (incl. hydraulic actuators)
Height                                2850 mm
Weight                                approx. 12,5 t
Max. Material flow               60 t per h

 

Client: POSCO Engineering & Construction

Project duration: 02/2002 to 05/2002

POSCO Slide Gate

Scope of engineering:

 Basic and detail engineering
- Multiple material slide gate
- slide gates
- hydraulic drive system
- refractory lining

Creation of bill of materials
Static calculation of all components
Project management
Scheduling
Preparation of operating and maintenance manuals
Assembly and erection engineering
Commissioning
Operator training
Documentation
 
Technical data:
Diameter inlet                     DN1600
Diameter outlet                   5x DN300
Length                                approx. 6200 mm (incl. hydraulic actuators)
Width                                 approx. 6200 mm (incl. hydraulic actuators)
Height                                2850 mm
Weight                                approx. 12,5 t
Max. Material flow               60 t per h

 

Client: POSCO Engineering & Construction

Project duration: 02/2002 to 05/2002

POSCO Slide Gate

Scope of engineering:

 Basic and detail engineering
- Multiple material slide gate
- slide gates
- hydraulic drive system
- refractory lining

Creation of bill of materials
Static calculation of all components
Project management
Scheduling
Preparation of operating and maintenance manuals
Assembly and erection engineering
Commissioning
Operator training
Documentation
 
Technical data:
Diameter inlet                     DN1600
Diameter outlet                   5x DN300
Length                                approx. 6200 mm (incl. hydraulic actuators)
Width                                 approx. 6200 mm (incl. hydraulic actuators)
Height                                2850 mm
Weight                                approx. 12,5 t
Max. Material flow               60 t per h

 

Client: POSCO Engineering & Construction

Project duration: 02/2002 to 05/2002

POSCO Quenchtank / Austria

POSCO Quenchtank / Austria Show Reference
POSCO Quenchtank

Scope of engineering:

Basic and detail engineering
- Quenchtank
- Apron Conveyor
- Drag Chain Conveyor

Creation of bill of materials
Static calculation of all components
Project management
Scheduling
Preparation of operating and maintenance manuals
Assembly and erection engineering
Commissioning
Operator training
Documentation
 
Technical data:
Length                               21500 mm
Width                                3150 mm
Height                               370 mm
Nominal conveyor width    2100 mm
Weight                               approx. 70 t (without water filling)
Capacity                            140 t/h (min. 42, max. 175)
Belt velocity                       3 up to 10 m/min
Centre distance                 14400 mm
Drive unit                           planetary gear unit

 

Client: POSCO Engineering & Construction

 

Project duration: 02/2002 to 07/2002

POSCO Quenchtank

Scope of engineering:

Basic and detail engineering
- Quenchtank
- Apron Conveyor
- Drag Chain Conveyor

Creation of bill of materials
Static calculation of all components
Project management
Scheduling
Preparation of operating and maintenance manuals
Assembly and erection engineering
Commissioning
Operator training
Documentation
 
Technical data:
Length                               21500 mm
Width                                3150 mm
Height                               370 mm
Nominal conveyor width    2100 mm
Weight                               approx. 70 t (without water filling)
Capacity                            140 t/h (min. 42, max. 175)
Belt velocity                       3 up to 10 m/min
Centre distance                 14400 mm
Drive unit                           planetary gear unit

 

Client: POSCO Engineering & Construction

 

Project duration: 02/2002 to 07/2002

POSCO Quenchtank

Scope of engineering:

Basic and detail engineering
- Quenchtank
- Apron Conveyor
- Drag Chain Conveyor

Creation of bill of materials
Static calculation of all components
Project management
Scheduling
Preparation of operating and maintenance manuals
Assembly and erection engineering
Commissioning
Operator training
Documentation
 
Technical data:
Length                               21500 mm
Width                                3150 mm
Height                               370 mm
Nominal conveyor width    2100 mm
Weight                               approx. 70 t (without water filling)
Capacity                            140 t/h (min. 42, max. 175)
Belt velocity                       3 up to 10 m/min
Centre distance                 14400 mm
Drive unit                           planetary gear unit

 

Client: POSCO Engineering & Construction

 

Project duration: 02/2002 to 07/2002

ORINOCO iron air cooling conveyor / Austria

ORINOCO iron air cooling conveyor / Austria Show Reference
ORINOCO iron air cooling conveyor

Scope of engineering:

Basic and detail engineering
- Air Cooling Conveyor
- supporting steel structure
- air duct, air hood system
- steel conveyor belt
- conveyor plates
- drive units
- steel structures for operation

 

Creation of bill of materials
Static calculation
Project management
Scheduling
Preparation of operating and maintenance manuals
Assembly and erection engineering
Commissioning
Operator training
Documentation
 

Technical data:
Capacity                    70 t/h (min. 15, max. 88)
Conveyor velocity      0.5 up to 4 m/h
Type of drive             planetary gear unit
Drive power               13 kW
Length                      approx. 42 m
Width:                      approx. 5 m (incl. air fan)
Height:                     approx. 10 m (incl. air hood)
Weight                      approx. 100 t (incl. steel structure)

 

Client: Siemens VAI

Project duration: 02/1998 to 05/2000

ORINOCO iron air cooling conveyor

Scope of engineering:

Basic and detail engineering
- Air Cooling Conveyor
- supporting steel structure
- air duct, air hood system
- steel conveyor belt
- conveyor plates
- drive units
- steel structures for operation

 

Creation of bill of materials
Static calculation
Project management
Scheduling
Preparation of operating and maintenance manuals
Assembly and erection engineering
Commissioning
Operator training
Documentation
 

Technical data:
Capacity                    70 t/h (min. 15, max. 88)
Conveyor velocity      0.5 up to 4 m/h
Type of drive             planetary gear unit
Drive power               13 kW
Length                      approx. 42 m
Width:                      approx. 5 m (incl. air fan)
Height:                     approx. 10 m (incl. air hood)
Weight                      approx. 100 t (incl. steel structure)

 

Client: Siemens VAI

Project duration: 02/1998 to 05/2000

ORINOCO iron air cooling conveyor

Scope of engineering:

Basic and detail engineering
- Air Cooling Conveyor
- supporting steel structure
- air duct, air hood system
- steel conveyor belt
- conveyor plates
- drive units
- steel structures for operation

 

Creation of bill of materials
Static calculation
Project management
Scheduling
Preparation of operating and maintenance manuals
Assembly and erection engineering
Commissioning
Operator training
Documentation
 

Technical data:
Capacity                    70 t/h (min. 15, max. 88)
Conveyor velocity      0.5 up to 4 m/h
Type of drive             planetary gear unit
Drive power               13 kW
Length                      approx. 42 m
Width:                      approx. 5 m (incl. air fan)
Height:                     approx. 10 m (incl. air hood)
Weight                      approx. 100 t (incl. steel structure)

 

Client: Siemens VAI

Project duration: 02/1998 to 05/2000

PP Wien Süd - Steel Chimneys / Austria

PP Wien Süd - Steel Chimneys / Austria Show Reference
PP Wien Süd - Steel Chimneys

Scope of engineering:

Basic and detail engineering
- 2 industrial steel chimneys
- Engineering personnel lift for the inspection of the flue tube

Creation of bill of materials
Static calculation of all components
Project management
Creation and submission of all documents to technical inspection
Scheduling
Preparation of operating and maintenance manuals
Assembly and erection engineering
Commissioning
Operator training
Documentation
Maintenance

Technical data:
Height                                                         68200 mm
Diameter flue tube                                      2100 mm
Dimensions flue gas duct                           2400 x 1600 mm
Diameter supporting tube                           3400 mm
Weight                                                        approx. 93 t

Client: Wien Energie GmbH

Project duration: 01/1995 to 05/1995

 

 

PP Wien Süd - Steel Chimneys

Scope of engineering:

Basic and detail engineering
- 2 industrial steel chimneys
- Engineering personnel lift for the inspection of the flue tube

Creation of bill of materials
Static calculation of all components
Project management
Creation and submission of all documents to technical inspection
Scheduling
Preparation of operating and maintenance manuals
Assembly and erection engineering
Commissioning
Operator training
Documentation
Maintenance

Technical data:
Height                                                         68200 mm
Diameter flue tube                                      2100 mm
Dimensions flue gas duct                           2400 x 1600 mm
Diameter supporting tube                           3400 mm
Weight                                                        approx. 93 t

Client: Wien Energie GmbH

Project duration: 01/1995 to 05/1995

 

 

PP Wien Süd - Steel Chimneys

Scope of engineering:

Basic and detail engineering
- 2 industrial steel chimneys
- Engineering personnel lift for the inspection of the flue tube

Creation of bill of materials
Static calculation of all components
Project management
Creation and submission of all documents to technical inspection
Scheduling
Preparation of operating and maintenance manuals
Assembly and erection engineering
Commissioning
Operator training
Documentation
Maintenance

Technical data:
Height                                                         68200 mm
Diameter flue tube                                      2100 mm
Dimensions flue gas duct                           2400 x 1600 mm
Diameter supporting tube                           3400 mm
Weight                                                        approx. 93 t

Client: Wien Energie GmbH

Project duration: 01/1995 to 05/1995

 

 

PP Wien Süd - Steel Chimneys

Scope of engineering:

Basic and detail engineering
- 2 industrial steel chimneys
- Engineering personnel lift for the inspection of the flue tube

Creation of bill of materials
Static calculation of all components
Project management
Creation and submission of all documents to technical inspection
Scheduling
Preparation of operating and maintenance manuals
Assembly and erection engineering
Commissioning
Operator training
Documentation
Maintenance

Technical data:
Height                                                         68200 mm
Diameter flue tube                                      2100 mm
Dimensions flue gas duct                           2400 x 1600 mm
Diameter supporting tube                           3400 mm
Weight                                                        approx. 93 t

Client: Wien Energie GmbH

Project duration: 01/1995 to 05/1995

 

 

PP Wien Süd - Steel Chimneys

Scope of engineering:

Basic and detail engineering
- 2 industrial steel chimneys
- Engineering personnel lift for the inspection of the flue tube

Creation of bill of materials
Static calculation of all components
Project management
Creation and submission of all documents to technical inspection
Scheduling
Preparation of operating and maintenance manuals
Assembly and erection engineering
Commissioning
Operator training
Documentation
Maintenance

Technical data:
Height                                                         68200 mm
Diameter flue tube                                      2100 mm
Dimensions flue gas duct                           2400 x 1600 mm
Diameter supporting tube                           3400 mm
Weight                                                        approx. 93 t

Client: Wien Energie GmbH

Project duration: 01/1995 to 05/1995

WTE Wels Bridge / Austria

WTE Wels Bridge / Austria Show Reference
WTE Wels Bridge

Scope of engineering:

Basic and detail engineering
- bridge including the verification of the bridge bearing
- cooling water pipes
- stop log and trash rack including installation concepts
- electrical fish repelling system

Creation of bill of materials
Static calculation of all components
Project management
Scheduling
Assembly and erection engineering
Commissioning
Operator training
Documentation
Maintenance

Technical data:
Length bridge                                      30500 mm
Width bridge                                        4400 to 6000 mm
Total weight of bridge                           approx. 70 t (without pipes)
Nominal diameters of the pipe system    DN1400, DN1200 und DN800
Accessible by truck
Stop log                                               w=4000 mm, h=3500 mm incl. filling valve
Trash rack                                            w=4000 mm, h=3500 mm, bar spacing=88 mm

Client: Welser Abfallverwertung GmbH

Project Duration: 08/1994 to 09/1994

WTE Wels Bridge

Scope of engineering:

Basic and detail engineering
- bridge including the verification of the bridge bearing
- cooling water pipes
- stop log and trash rack including installation concepts
- electrical fish repelling system

Creation of bill of materials
Static calculation of all components
Project management
Scheduling
Assembly and erection engineering
Commissioning
Operator training
Documentation
Maintenance

Technical data:
Length bridge                                      30500 mm
Width bridge                                        4400 to 6000 mm
Total weight of bridge                           approx. 70 t (without pipes)
Nominal diameters of the pipe system    DN1400, DN1200 und DN800
Accessible by truck
Stop log                                               w=4000 mm, h=3500 mm incl. filling valve
Trash rack                                            w=4000 mm, h=3500 mm, bar spacing=88 mm

Client: Welser Abfallverwertung GmbH

Project Duration: 08/1994 to 09/1994

 

WTE Wels Bridge

Scope of engineering:

Basic and detail engineering
- bridge including the verification of the bridge bearing
- cooling water pipes
- stop log and trash rack including installation concepts
- electrical fish repelling system

Creation of bill of materials
Static calculation of all components
Project management
Scheduling
Assembly and erection engineering
Commissioning
Operator training
Documentation
Maintenance

Technical data:
Length bridge                                      30500 mm
Width bridge                                        4400 to 6000 mm
Total weight of bridge                           approx. 70 t (without pipes)
Nominal diameters of the pipe system    DN1400, DN1200 und DN800
Accessible by truck
Stop log                                               w=4000 mm, h=3500 mm incl. filling valve
Trash rack                                            w=4000 mm, h=3500 mm, bar spacing=88 mm

Client: Welser Abfallverwertung GmbH

Project Duration: 08/1994 to 09/1994