VASCOIL 2 / Austria

VASCOIL 2 / Austria Show Reference
VASCOIL 2 / Austria

Scope of services:
- Refurbishment of the downcoilers of the hot rolling mill in Linz (Consortium with Siemens VAI)
- Supply of approx. 670 tonnes equipment Revamp of the downcoiler 3, 4 & 5 during shut downs (16 days each)

Orderer: Siemens VAI
End customer: voestalpine Stahl
Period of time for realization: 2009 – 2012

Construction of a distribution center / Austria

Construction of a distribution center / Austria Show Reference
Construction of a distribution center / Austria

Scope of services:
- Construction of a distribution center as a general contractor, including the integration of existing offices and maintenance buildings
- Steel construction with integrated platforms for a total warehouse area of about 3.900 m²

Orderer: MCE Gerätetechnik
Period of time for realization: 2009

ESP Taranto / Italy

ESP Taranto / Italy Show Reference
ESP Taranto / Italy

Scope of services:
- Demolishing of the roof and the internal parts of the existing filter
- Extension for the filter casing
- Installation of the internal equipment
- Erection of a new roof
- Dismantling of existing filter 400 tonnes
- Installation Steel structure 350 tonnes
- Installation internal parts 400 tonnes

Orderer: GE-Germany
End costumer: ILVA / Taranto
Period of time for realization: 2007

Crop Shear / Austria

Crop Shear / Austria Show Reference
Crop Shear / Austria

Scope of services:
Crop shear unit

- Erection of approx. 1.800 tonnes mechanical equipment and 200 tonnes technological steel structure

Orderer: Siemens VAI
End costumer: voestalpine Stahl
Period of time for realization: 2006 – 2007

Reactor Borealis / Germany

Reactor Borealis / Germany Show Reference
Reactor Borealis / Germany

Scope of services:
- Fabrication of a high pressure vessel

Length: 32,3 m; Ø= 7,0 m
Pressure: 46 bar
Weight: 167,3 tonnes
Orderer: Borealis
Period of time for realization: 2006

Rail Rolling Mill / Austria

Rail Rolling Mill / Austria Show Reference
Rail Rolling Mill / Austria

Scope of services:
- Disassembling of a rail rolling Mill
- 5.000 tonnes within 5 days

Orderer: voestalpine Schiene
Period of time for realization: 2005

ESP „AF 20“ / Austria

ESP „AF 20“ / Austria Show Reference
ESP „AF 20“ / Austria

Scope of services:
- Dismantling of the roof section incl. internals, rebuilding/ erection for electrostatic precipitator

Weight: disassembling 140 tonnes
Assembling: 190 tonnes
Shut down time: 29 days
Orderer: BHA Gruppe
Period of time for realization: 2009 – 2011

ESP „AF 40“ / Austria

ESP „AF 40“ / Austria Show Reference
ESP „AF 40“ / Austria

Scope of services:
- Erection of a new ESP (electrostatic precipitator)

Weight steel structure: 260 tonnes
Weight internal parts: 110 tonnes
Orderer: BHA Gruppe
Period of time for realization: 2004 – 2005

Sintering Plant / Austria

Sintering Plant / Austria Show Reference
Sintering Plant / Austria

Scope of services:
- Extension of Sinter Plant with new cooler and sinter conveyor

Erection weight: 2.500 tonnes
Plant downtime: 20 days
Orderer: voestalpine Stahl
Period of time for realization: 2004 – 2005

Blast furnance „A“ / Austria

Blast furnance „A“ / Austria Show Reference
Blast furnance „A“ / Austria

Scope of services:
- De-erection of old blast furnace, fabrication and erection of new blast furnace
- De-erection and erection of charging, bleeder construction and hot-blast line
- Reconstruction of hot-blast stove, gas cleaning, gas scrubber and replacement of sound absorber
- De-erection: approx. 3.500 tonnes
- Total weight erection: approx. 5.000 tonnes

Shut down time: 100 days
Orderer: voestalpine Stahl
Period of time for realization: 2003 – 2004

Steel Converter No. 7, 8 & 9 / Austria

Steel Converter No. 7, 8 & 9 / Austria Show Reference
Steel Converter No. 7, 8 & 9 / Austria

Scope of services:
- Change of 2 steel converters (LD III) including change of bearing ring segments

Shut down time: 22 instead of planned 26 days
Orderer: SMSD
End customer: voestalpine Stahl
Period of time for realization: 2001

Blast Furnace 5 & 6 / Austria

Blast Furnace 5 & 6 / Austria Show Reference
Blast Furnace 5 & 6 / Austria

Scope of services:
Revamping of the blast furnaces

- Shut down time: 6 months
- Replacement of cladding sheet
- Lifting of remained tank
- Height: 14 m
- Weight: approx. 1.000 tonnes

Orderer: voestalpine Stahl
Period of time for realization: 2000 – 2001

General reconstruction of main station Frankfurt a.M. / Germany

General reconstruction of main station Frankfurt a.M. / Germany Show Reference
General reconstruction of main station Frankfurt a.M. / Germany

Scope of services:
- General contractor for the complete reconstruction of five platform halls under monumental protection
- Renewal of 5.000 tonnes steel, 60.000 m² roof and wall covering
- Reduction of construction time by 6 months

Orderer: DB Station & Service AG
Period of time for realization: 2002 – 2006

Steel Service Center / Austria

Steel Service Center / Austria Show Reference
Steel Service Center / Austria

Scope of services:
- Erection of a warehouse for incoming material and a production hall for sheet metal working incl. modern staff facilities and a cut-to-length line incl. office

Orderer: voestalpine Stahl Service Center (SSC)
Period of time for realization: 2005 – 2006

Rehabilitation Railway station Wuppertal / Germany

Rehabilitation Railway station Wuppertal / Germany Show Reference
Rehabilitation Railway station Wuppertal / Germany

Scope of services:- Reconstruction of route over land and parts over water- Manufacture and erection of steel structure for the Railway station- Vohwinkel, Sonnborn, Bruch, Hammerstein and Landgericht- Revitalisation “Stütze 100”

Orderer: Wuppertaler Schwebebahn
Projects: 1998 – 2010

Blast Furnace Donawitz / Austria

Blast Furnace Donawitz / Austria Show Reference
Blast Furnace Donawitz / Austria

Scope of services:
- Yearly continuous maintenance works over a period of more than 30 years

Orderer: voestalpine Stahl