Solvent Deasphalting Unit (SDA) / PL4 Refinery Porvoo / Finland

Solvent Deasphalting Unit (SDA) / PL4Refinery Porvoo / Finland Show Reference
Solvent Deasphalting Unit (SDA) / PL4 Refinery Porvoo

Client:   Neste Oyj

 

Scope of services:

▪Site management and installation

▪950 tonnes piping systems incl. NDT

▪1.700 tonnes of equipment  (Apparatus, vessels, tanks, heat exchangers, filters, pumps)

▪3.000 isometric drawings / 35.000 welds

▪6.000 runmeter hot oil tracing

▪Painting

 

Total manhours: approx. 240.000 h

 

Project duration: November 2015 – February 2017

Solvent Deasphalting Unit (SDA) / PL4 Refinery Porvoo

Client:   Neste Oyj

 

Scope of services:

▪Site management and installation

▪950 tonnes piping systems incl. NDT

▪1.700 tonnes of equipment  (Apparatus, vessels, tanks, heat exchangers, filters, pumps)

▪3.000 isometric drawings / 35.000 welds

▪6.000 runmeter hot oil tracing

▪Painting

 

Total manhours: approx. 240.000 h

 

Project duration: November 2015 – February 2017

Solvent Deasphalting Unit (SDA) / PL4 Refinery Porvoo

Client:   Neste Oyj

 

Scope of services:

▪Site management and installation

▪950 tonnes piping systems incl. NDT

▪1.700 tonnes of equipment  (Apparatus, vessels, tanks, heat exchangers, filters, pumps)

▪3.000 isometric drawings / 35.000 welds

▪6.000 runmeter hot oil tracing

▪Painting

 

Total manhours: approx. 240.000 h

 

Project duration: November 2015 – February 2017

Neste Oyj, HPU 3 Connections and Utilities Porvoo / Finland

Neste Oyj, HPU 3 Connections and Utilities Porvoo / Finland Show Reference
HPU 3 Connections and Utilities / PL4 Raffinerie Porvoo

Client:    Neste Oyj

 

Scope of services:

▪Fabrication and installation of 60 no. of piping lines incl. Supports and valves approx. 350 tons incl. NDT

 ▪Pressure test for piping systems

▪Material: carbon steel SA106B and SA333-6, SA335-P1, SA335-P5, SA355-P11, stainless steel TP316L

 ▪Painting

 

Total manhours: approx. 30.000 h

 

Project duration: July 2015 – November 2015

HPU 3 Connections and Utilities / PL4 Raffinerie Porvoo

Client:    Neste Oyj

 

Scope of services:

▪Fabrication and installation of 60 no. of piping lines incl. Supports and valves approx. 350 tons incl. NDT

 ▪Pressure test for piping systems

▪Material: carbon steel SA106B and SA333-6, SA335-P1, SA335-P5, SA355-P11, stainless steel TP316L

 ▪Painting

 

Total manhours: approx. 30.000 h

 

Project duration: July 2015 – November 2015

HPU 3 Connections and Utilities / PL4 Raffinerie Porvoo

Client:    Neste Oyj

 

Scope of services:

▪Fabrication and installation of 60 no. of piping lines incl. Supports and valves approx. 350 tons incl. NDT

 ▪Pressure test for piping systems

▪Material: carbon steel SA106B and SA333-6, SA335-P1, SA335-P5, SA355-P11, stainless steel TP316L

 ▪Painting

 

Total manhours: approx. 30.000 h

 

Project duration: July 2015 – November 2015

Gassco Emden /
Germany

Gassco Emden /<br /> Germany Show Reference
Mechanical erection of the Norsea Gas Terminal (NGT)

Orderer: Linde AG

Client: Gassco AS

Scope of services: Prefabrication of approx. 150 module and complete mechanical erection incl. insulation, corrosion protection and fire-protection (Chartek)

Weight pipe material: 2.100 to

Weight steel structure: 2.200 to

Length of pipe: approx. 13.800 m

Weldseams: approx. 8.970 piece

Dimension piping: DN 1“ – DN 36“

Material: L415NB, P355NL1, 1.4571, 1.4404

Project duration: March 2014 – August 2015

Mechanical erection of the Norsea Gas Terminal (NGT)

Orderer: Linde AG

Client: Gassco AS

Scope of services: Prefabrication of approx. 150 module and complete mechanical erection incl. insulation, corrosion protection and fire-protection (Chartek)

Weight pipe material: 2.100 to

Weight steel structure: 2.200 to

Length of pipe: approx. 13.800 m

Weldseams: approx. 8.970 piece

Dimension piping: DN 1“ – DN 36“

Material: L415NB, P355NL1, 1.4571, 1.4404

Project duration: March 2014 – August 2015

Mechanical erection of the Norsea Gas Terminal (NGT)

Orderer: Linde AG

Client: Gassco AS

Scope of services: Prefabrication of approx. 150 module and complete mechanical erection incl. insulation, corrosion protection and fire-protection (Chartek)

Weight pipe material: 2.100 to

Weight steel structure: 2.200 to

Length of pipe: approx. 13.800 m

Weldseams: approx. 8.970 piece

Dimension piping: DN 1“ – DN 36“

Material: L415NB, P355NL1, 1.4571, 1.4404

Project duration: March 2014 – August 2015

Mechanical erection of the Norsea Gas Terminal (NGT)

Orderer: Linde AG

Client: Gassco AS

Scope of services: Prefabrication of approx. 150 module and complete mechanical erection incl. insulation, corrosion protection and fire-protection (Chartek)

Weight pipe material: 2.100 to

Weight steel structure: 2.200 to

Length of pipe: approx. 13.800 m

Weldseams: approx. 8.970 piece

Dimension piping: DN 1“ – DN 36“

Material: L415NB, P355NL1, 1.4571, 1.4404

Project duration: March 2014 – August 2015

Neste Oil, BESSI Porvoo / Finland

Neste Oil, BESSI Porvoo / Finland Show Reference
PL1 Naphta Isomerization BESSI Porvoo

Client:    Neste Oil Oyj

 

Scope of services:

▪Installation of Equipment – approx. 190 tons

▪Installation of Steel Work – approx. 500 tons

▪Fabrication and installation of 1.560 no. of piping lines
incl. Supports and valves – approx. 200 tons

▪Pressure test for piping systems

▪Material: carbon steel SA106B and SA333-6, stainless steel TP316L and TP321

▪Painting

▪Tracing, Electrical and Instrumentation

▪Total manhours: approx. 150.000 h

 

Project duration: March 2014 – January 2015

PL1 Naphta Isomerization BESSI Porvoo

Client:    Neste Oil Oyj

 

Scope of services:

▪Installation of Equipment – approx. 190 tons

▪Installation of Steel Work – approx. 500 tons

▪Fabrication and installation of 1.560 no. of piping lines
incl. Supports and valves – approx. 200 tons

▪Pressure test for piping systems

▪Material: carbon steel SA106B and SA333-6, stainless steel TP316L and TP321

▪Painting

▪Tracing, Electrical and Instrumentation

▪Total manhours: approx. 150.000 h

 

Project duration: March 2014 – January 2015

Neste Oil, refinery Porvoo / Finnland

Neste Oil, refinery Porvoo / Finnland Show Reference
Replacement of piping and Equipment PHCT-PHDF/PL3 TA2015 refinery Porvoo

Client:    Neste Oyj

 

Scope of services in Pre-SD and SD:

▪Demolition, Fabrication and installation incl. Pressure tests of 550 no. of piping lines incl. Supports and valves approx. 260 tons incl. NDT

▪Installation of Equipment approx. 250 tons

▪Fabrication and Installation of Steel Work approx. 80 tons

▪Material: carbon steel SA106B and SA333-6, alloyed steel SA335-P5 and SA335-P9, stainless steel TP316L

▪Painting and Insulation of piping Systems

▪Electrical heat tracing and Steam-Tracing,

▪Electrical and Instrumentation

 

Total manhours: approx. 145.000 h

Project duration: December 2014 – June 2015

Duration of SD: 19th April 2015 to 24th May 2015

Replacement of piping and Equipment PHCT-PHDF/PL3 TA2015 refinery Porvoo

Client:    Neste Oyj

 

Scope of services in Pre-SD and SD:

▪Demolition, Fabrication and installation incl. Pressure tests of 550 no. of piping lines incl. Supports and valves approx. 260 tons incl. NDT

▪Installation of Equipment approx. 250 tons

▪Fabrication and Installation of Steel Work approx. 80 tons

▪Material: carbon steel SA106B and SA333-6, alloyed steel SA335-P5 and SA335-P9, stainless steel TP316L

▪Painting and Insulation of piping Systems

▪Electrical heat tracing and Steam-Tracing,

▪Electrical and Instrumentation

 

Total manhours: approx. 145.000 h

Project duration: December 2014 – June 2015

Duration of SD: 19th April 2015 to 24th May 2015

REVAMP Polyethylene Plant Litvinov / Czech Republic

REVAMP Polyethylene Plant Litvinov / Czech Republic Show Reference
REVAMP Polyethylene Plant Litvinov / Czech Republic

Scope of services:
- Dismantling and Erection of Equipment approx. 610 tonnes Piping approx. 120 tonnes
- Pressure tests
- Insulation
- Material storage and documentation by Linde “WSD” software

Pipe material: P235GH, TTST35N, 1.4541 for different standards of cleanliness
Pipe dimension: ½” up to 24”
Orderer: Linde KCA, Dresden
Realization: June – October 2007

Polypropylene Plant Slovnaft / Bratislava, Slovakia

Polypropylene Plant Slovnaft / Bratislava, Slovakia Show Reference
Polypropylene Plant Slovnaft / Bratislava, Slovakia

Scope of services:
- Material handling
- Erection of piping approx. 360 tonnes
- Documentation by Linde-WSD-software
- Non destructive material testing
- Internal and external corrosion prevention

Key data:
Approx. 1.700 isometric drawings
Approx. 16.500 m of pipes
Dimension of pipes: ½“ to 42“ (60% from ½“ to 3“)
15.200 welding seams
Pipe material:
ASTM A105, A234 WPB,   ASTM 312 Gr. TP 304 L, ASTM A 420 Gr. WPL 6
Cleanliness acc. Linde standards C1, C2, C3
Orderer: Linde KCA Dresden
Period of time for erection: May 2004 – February 2005

Polyethylene Plant Litvinov / Czech Republic

Polyethylene Plant Litvinov / Czech Republic Show Reference
Polyethylene Plant Litvinov / Czech Republic

Scope of services:
- Complete plant engineered with Intergraph PDS (3D)
- Material inbound logistic
- Material storage supported by Bilfinger VAM’s “MAAS” software system
- Erection of equipment
- Erection of piping approx. 600 tonnes
- Pressure tests
- Documentation by Linde “WSD” software

Key-data: Approx. 3000 isometric drawings
Pipe material predominantly DIN St 35.7 for different standards of cleanliness
Pipe dimension: ½” up to 43” (75%  1” up to 4”)
Approx. 10 welding joints per isometric drawing
Orderer: Linde KCA
Period of time for erection:  March – December 2001

PP5-(Polypropylene)-Plant / Austria

PP5-(Polypropylene)-Plant / Austria Show Reference
PP5-(Polypropylene)-Plant / Austria

Scope of services Bilfinger VAM / BuR:
- Project management and erection
- 650 tonnes piping systems
- 710 tonnes equipment (Apparatus, vessels, tanks, heat exchangers, filters, pumps)
- 8 compressor packages
- Approx. 2.800 isometrics
- Approx. 30.000 welding seams

Orderer: BOREALIS-Schwechat, Austria
Period of time for erection: July 1999 – January 2000
Successful commissioning: May 2000