Bilfinger VAM Anlagentechnik GmbH

Navigation

References Paper and Pulp

Place for the big image

Commerzbank Arena

Deutschland

Bilfinger Berger betreibt...
Place for the small images

Biocel Paskov /
Czech Republic

Biocel Paskov /<br />Czech Republic Show Reference
Tanks and ducts for recovery boiler

Client: Biocel Paskov

Scope of services:

  • Prefabrication, supply, erection and documentation
  • 5 Tanks
  • Diameter: 6,1m
  • Height: 16 m
  • Weight: ca. 125 t
  • 5 Ducts
  • Weight: ca. 30 t
  • Material: 1.4547, 1.4436, 1.4571, 1.4301 and P235GH

Project duration: June 2011 – March 2012

Mondi Frantschach / Austria

Mondi Frantschach / Austria Show Reference
External Piping Recovery Boiler 4

Client: Mondi Frantschach GmbH

Scope of services:

  • Supply, fabrication and erection of the external Piping for Recovery Boiler 4 including steel construction for pipe rack, primary and secondary steel construction incl. approx. 50 tie in‘s during shut down 2012.
  • Piping length: 3.500 m
  • Weight pipe racks and secondary steel construction: 130 tons
  • Dimensions: DN 25 – DN 1000
  • Span length of pipe racks: 10,7 m, 18 m and 20 m
  • Material: 10CrMo910, 16Mo3, P235GH, 1.4301. 1.4571, 1.4436

Project duration: March 2012 – April 2013

 

Mondi Stambolijski / Bulgaria

Mondi Stambolijski / Bulgaria Show Reference
BoP-Verrohrung

Client: Mondi Stambolijski EAD – Kraft Paper

Scope of services:

  • Basic- & Detailengineering, supply, fabrication, erection, commissioning and trial operation of the BoP-Piping
  • Piping length: 1.900 m
  • Piping weight: 75 tons
  • Dimensions: DN 15 – DN 1200
  • Weight of equipment and valves: 33 to
  • Supplied equipment for BoP-Piping: Reducing stations, desuperheater (spray water unit), silencer, water treatment, pumps, 360 pices valves and instruments
  • Material: 1.4541

Project duration: January 2013 – November 2013

 

Mondi SCP Ruzomberok / Slovakia

Mondi  SCP Ruzomberok / Slovakia Show Reference
Evaporation Plant

Client: Andritz Oy

Scope of services:

  • Supply and erection of the Evaporation Plant
  • 6 Evaporators (2900 x 11500, 3600 x 11500, 4600 x 11000, 5000 x 11000, 5100 x 11000, 6800 x 11000)
  • Material 1.4301, 1.4162
  • Detail-Engineering, supply and erection Firing Liquor Tank (6.000 x 22.450 mm)
  • Material: 1.4162
  • Steel construction (total weight: approx. 240 tons)

Project duration: April 2013 – March 2014

Modification evaporation plant / Austria

Modification evaporation plant / Austria Show Reference
Modification evaporation plant / Austria

Scope of services:
- Supply and
- installation of vaporizer incl. piping

Material: 1.4301
Dimensions: DN15 - DN2300
- Erection of equipment
- Vacuum breaker
- Pumps
- Tanks
- Engineering, supply and installation of steel structures

Total weight of installation: 283 tonnes
Orderer: Zellstoff Pöls AG
Period of time for realization: March – December 2008

Evaporation plant / Steti, Czech Republic

Evaporation plant / Steti, Czech Republic Show Reference
Evaporation plant / Steti, Czech Republic

Scope of services:
Fabrication and erection of the whole evaporation plant:
- 4 Evaporators

3900 x 1100 mm
4900 x 10500 mm
5400 x 11000 mm
6500 x 11000 mm

Material: 1.4301
Firing Liquor Tank
7000 x 19250 mm

Material: 1.4462
- All piping systems

Material: St 35.8I, 1.4301, 1.4436, 1.4462
- Steel structures

Weight: approx. 737 tonnes
Client: Mondi Paper, Steti / CZ
Orderer: Andritz Oy
Period of time of erection: January – September 2005

Evaporation Plant / Frantschach, Austria

Evaporation Plant / Frantschach, Austria Show Reference
Evaporation Plant / Frantschach, Austria

Scope of services:
Detailengineering, fabrication and erection of
- 6 Evaporat vessels inclusive lamella packages and internal piping
- 7 Vapour-Ducts
- 16 Circulation pipes
- Process piping

Material: 1.4301
Total Weight: 433 tonnes
Client: Frantschach Pulp & Paper Austria AG
Orderer: Andritz AG
Period of erection: May – September 2003