References Conventional Power Plants and Combined Gas and Steam Turbine Plants

References Conventional Power Plants and Combined Gas and Steam Turbine Plants

Place for the big image

Commerzbank Arena

Deutschland

Bilfinger Berger betreibt...
Place for the small images

Delivery and Prefab-rication Powerstation Beni Suef / Egypt

Delivery and Prefab-rication Powerstation Beni Suef / Egypt Show Reference
Delivery and Prefabrication Siemens-Powerstation Beni Suef

Customer:   SIEMENS AG - Offenbach

 

Scope of services:

(Consortium VAM/BPT, Leader of Consortium BILFINGER VAM Anlagentechnik GmbH)

• Delivery of pipes, fittings, primary- and secondary supports

• Prefabrication of piping spools

• Seaworthy packaging

• Documentation

• Weight of piping materials:  1.250 t

• Weight of supports incl. secondary pipe supports:   230 t

• Dimensions of piping: DN 25 to DN 1000 (est. 80.000 DIA-INCH)

• Materials (ASME):  Carbon Steel, Stainless Steel 316L

 

Project duration:  Dezember 2015 – June 2016

Delivery and Prefabrication Siemens-Powerstation Beni Suef

Customer:   SIEMENS AG - Offenbach

 

Scope of services:

(Consortium VAM/BPT, Leader of Consortium BILFINGER VAM Anlagentechnik GmbH)

• Delivery of pipes, fittings, primary- and secondary supports

• Prefabrication of piping spools

• Seaworthy packaging

• Documentation

• Weight of piping materials:  1.250 t

• Weight of supports incl. secondary pipe supports:   230 t

• Dimensions of piping: DN 25 to DN 1000 (est. 80.000 DIA-INCH)

• Materials (ASME):  Carbon Steel, Stainless Steel 316L

 

Project duration:  Dezember 2015 – June 2016

Delivery and Prefabrication Siemens-Powerstation Beni Suef

Customer:   SIEMENS AG - Offenbach

 

Scope of services:

(Consortium VAM/BPT, Leader of Consortium BILFINGER VAM Anlagentechnik GmbH)

• Delivery of pipes, fittings, primary- and secondary supports

• Prefabrication of piping spools

• Seaworthy packaging

• Documentation

• Weight of piping materials:  1.250 t

• Weight of supports incl. secondary pipe supports:   230 t

• Dimensions of piping: DN 25 to DN 1000 (est. 80.000 DIA-INCH)

• Materials (ASME):  Carbon Steel, Stainless Steel 316L

 

Project duration:  Dezember 2015 – June 2016

Combined Cycle Power Plant Leppersdorf / Germany

Combined Cycle Power PlantLeppersdorf / Germany Show Reference
Combined Cycle Power Plant Leppersdorf

Client:   Sachsenmilch Leppersdorf GmbH

 

Scope of services:

▪Basic- & Detail-Engineering, supply, fabrication, erection incl. commissioning and trial operation of piping systems in water-steam cycle within total water treatment

▪Piping length: 3.000 m

▪Piping weight: 50 tons

▪Dimensions: DN 15 – DN 350

▪Supplied Equipment for WSC:

▪Reducing stations, evaporative cooler, silencer, water treatment and pumps

▪Material: 16Mo3, P235GH, 1.4541, 1.4571

 

Project duration: June 2013 – April 2014

Combined Cycle Power Plant Leppersdorf

Client:   Sachsenmilch Leppersdorf GmbH

 

Scope of services:

▪Basic- & Detail-Engineering, supply, fabrication, erection incl. commissioning and trial operation of piping systems in water-steam cycle within total water treatment

▪Piping length: 3.000 m

▪Piping weight: 50 tons

▪Dimensions: DN 15 – DN 350

▪Supplied Equipment for WSC:

▪Reducing stations, evaporative cooler, silencer, water treatment and pumps

▪Material: 16Mo3, P235GH, 1.4541, 1.4571

 

Project duration: June 2013 – April 2014

Combined Cycle Power Plant Leppersdorf

Client:   Sachsenmilch Leppersdorf GmbH

 

Scope of services:

▪Basic- & Detail-Engineering, supply, fabrication, erection incl. commissioning and trial operation of piping systems in water-steam cycle within total water treatment

▪Piping length: 3.000 m

▪Piping weight: 50 tons

▪Dimensions: DN 15 – DN 350

▪Supplied Equipment for WSC:

▪Reducing stations, evaporative cooler, silencer, water treatment and pumps

▪Material: 16Mo3, P235GH, 1.4541, 1.4571

 

Project duration: June 2013 – April 2014

Combined Cycle Power Plant Irsching 4
Germany

Combined Cycle Power Plant Irsching 4<br />Germany Show Reference
Gas- und Dampfturbinenanlage Irsching 4 / Deutschland

Scope of services:
Total BoP piping systems:

- Detailengineering
- Supply of pipes, fittings, compensators, supports, spring hangers
- Prefabrication
- Erection

Total weight: 500 tonnes
New material: P92
Orderer: Siemens AG, Erlangen
Period of time for erection: autumn 2009 – November 2010

Combined Cycle Power Plant Gönyü / Hungary

Combined Cycle Power Plant Gönyü / Hungary Show Reference
Combined Cycle Power Plant Gönyü / Hungary

Scope of services:
Total BoP piping systems:

- Detailengineering
- fabrication
- installation and
- commissioning of piping systems

Material: X10CrMoVNb9-1, 10CrMo9-10, 13CrMo4-5,16Mo3, P235GH,
1.4541, 1.4571
Total weight: 550 tonnes
Orderer: Siemens AG Power Generation
Period of time for realization: January 2009 – summer 2010
Period of time for erection: fall 2009 – summer 2010

Combined Cycle Power Plant Malzenice / Slovakia

Combined Cycle Power Plant Malzenice / Slovakia Show Reference
Combined Cycle Power Plant Malzenice / Slovakia

Orderer: Siemens AG Power Generation
Scope of services:
Total BoP piping systems:

- Detailengineering
- fabrication
- installation and
- commissioning of piping systems

Material: X10CrMoVNb9-1, 10CrMo9-10, 13CrMo4-5,16Mo3, P235GH,
1.4541, 1.4571
Total weight: 482 tonnes
Period of time for realization: January 2009 – summer 2010
Period of time for erection: fall 2009 – summer 2010

Combined Cycle Power Plant Timelkam / Austria

Combined Cycle Power Plant Timelkam / Austria Show Reference
Combined Cycle Power Plant Timelkam / Austria

a) Power Island Piping
Orderer: Siemens PGA, Wien   
b) Cooling water piping systems
Orderer: GEA Energietechnik

Scope of services:
- Detailengineering
- Supply of pipes, fittings, compensators, supports, spring hangers
- Prefabrication
- Erection

Total weight: 450 tonnes
Period of time for realization:
a) May 2007 – August 2009
b) February 2007 – August 2008

Combined Cycle Power Plant Irsching 5 / Germany

Combined Cycle Power Plant Irsching 5 / Germany Show Reference
Combined Cycle Power Plant Irsching 5 / Germany

Scope of services:
Total BoP piping systems:

- Detailengineering
- Supply of pipes, fittings, compensators, supports, spring hangers
- Prefabrication
- Erection

Total weight: 736 tonnes
Orderer: Siemens AG, Erlangen
Period of time for realization: May 2007 – September 2008

Combined Cycle Power Plant Köln-Knapsack / Germany

Combined Cycle Power Plant Köln-Knapsack / Germany Show Reference
Combined Cycle Power Plant Köln-Knapsack / Germany

Scope of services:
Total BoP piping systems:

- Detailengineering
- Supply of pipes, fittings, compensators, supports, spring hangers
- Prefabrication
- Erection

Weight: 736 tonnes
Orderer: Siemens AG, Germany
Period of time for realization: March 2006 – May 2007

Combined Cycle Power Plant Sumgait / Azerbajan

Combined Cycle Power Plant Sumgait / Azerbajan Show Reference
Combined Cycle Power Plant Sumgait / Azerbajan

Scope of services:
- Detailengineering with PDMS-software
- Supply of pipes, fittings, compensators, supports, spring hangers and absorber
- Prefabrication
- Transport and packaging

Material: A 106; P91; P11; 1.4439; 316; 321; GRP; HDPE; galvanized piping
Weight: 640 tonnes
Orderer: Siemens AG, Germany
Period of time for realization: March 2006 – March 2007

Combined Cycle Power Plant BASF-Antwerp / Belgium

Combined Cycle Power Plant BASF-Antwerp / Belgium Show Reference
Combined Cycle Power Plant BASF-Antwerp / Belgium

Scope of services: 1 gas turbine, 1 steam turbine, 1 boiler,
process steam system
Capacity: 400 MW electrical
Engineering, supply and erection
- Low-pressure steam system
- High-pressure steam system
- Condensate system
- Main cooling water system
- Auxiliary cooling water system
- Demineralzed water system
- Gas turbine piping
- Steam turbine piping
- Compressed air distribution system
- Waste water piping

Materials: A106B, A335-P11, A335-P22, A335-P91, A312TP304, A312TP316, GFK
Weights: 600 tonnes
Orderer: Siemens PG
Period of time for realization: December 2003 – January 2005

Combined Cycle Power Plant District heating plant / Austria

Combined Cycle Power Plant District heating plant / Austria Show Reference
Combined Cycle Power Plant District heating plant / Austria

Scope of services: 2 gas turbines, 1 steam turbine, 2 boilers
Capacity: 168.000 MWh/year electrical and 82 MW thermic power
Engineering, supply, erection and commissioning:
- Steam system
- 2 District heating condenser (19 to / pc.) 2 x 45 MW
- Fire-extinguishing system, raw water system
- Tank irrigation system
- Compressed air distribution system
- Liquid fuel system with underground storage tanks (4 x 100 m³)
- Pre-insulated district heating system
- Gas fuel system
- District heating
- Revamping of district heating storage tank 5.000 m³
- Middle expansion foam system

Orderer:  E-Werk Wels AG
Period of time for realization: November 1998 – September 2000

Combined Cycle Power Plant CSEPEL II / Budapest, Hungary

Combined Cycle Power Plant CSEPEL II / Budapest, Hungary Show Reference
Combined Cycle Power Plant CSEPEL II / Budapest, Hungary

Scope of services: Combined Cycle Power Plant consisting of:
2 gas turbines, 1 steam turbine, 2 boilers
Capacity: approx. 380 MW electrical und thermic power
Engineering, supply, erection and commissioning
- Main Cooling Water-System
- Aux Cooling Water-System
- Closed Circuit Cooling Water-System
- LP-Steam-System
- District Heating System
- Demineralized Water System
- Main Condensate System
- Internally Heating System
- Waste Water System

Materials: 15 Mo 3, 1.4301, St 35.8 I, S 235 JR, St 37.0, GGG 40,
C 22.8
Orderer: Powergen International, England
Period of time for realization: July 1998 – July 2000