Maasvlakte Power Plant 3 High pressure - Piping systems / The Nederlands

Maasvlakte Power Plant 3 High pressure - Piping systems / The Nederlands Show Reference
Maasvlakte Power Plant 3 High pressure - Piping systems / The Nederlands

Scope of Services:
- Detailengineering of „hot reheat-“ and „cold reheat-“ piping systems
- Fabrication of high pressure Induction-bends
- Supply of small bore pipes, nozzles, lugs and supports
- Erection of „hot reheat-“ and „cold reheat-“ piping systems

Material: X10CrWMoVNb9-2 (P92), 10CrMo9-10, 13CrMo4-5, 16Mo3
Total Weight: 1.150 tonnes (pipes and fittings)
Orderer: E.ON Benelux
Period of time for realization: July 2009 – September 2012

PP Westfalen – Gener-
ating unit D+E / Germany

PP Westfalen – Gener-<br>ating unit D+E / Germany Show Reference
PP Westfalen – Generating unit D+E / Germany

Scope of services Consortium MCE ET/Bilfinger VAM:
Middle- and low pressure piping systems:
- Detailengineering
- supply
- prefabrication and
- erection incl. start up and commissioning

Weight (without valves): approx. 380 tonnes
Length: approx. 4.700 m
Dimensions piping: DN 25 to DN 900
Material: P235GH, CrNi Material, PP
Orderer: RWE Power AG
Contractor: Consortium Babcock Borsig Service GmbH / MCE Energietechnik GmbH/Bilfinger VAM
Period of time for realization: May 2008 – July 2012

Steam Power Plant Gent / Belgium

Steam Power Plant Gent / Belgium Show Reference
Steam Power Plant Gent / Belgium

Scope of services:
Total BoP piping systems:
- Detailengineering
- supply
- fabrication and
- erection of the power plant piping systems

Total weight: approx. 800 tonnes
Total length: approx. 17.400 m
Material: P91, WB36, 16Mo3, P235 GH, 1.4571
Diameter: DN 15 to DN 1600
Orderer: Siemens AG, Erlangen
Client: Electrabel S.A.
Period of time for realization: February 2008 – November 2009

Hard Coal Power Plant Datteln 4 / Germany

Hard Coal Power Plant Datteln 4 / Germany Show Reference
Hard Coal Power Plant Datteln 4 / Germany

Scope of services:
High pressure piping systems:

- Detailengineering
- Supply of nozzles and lugs and fittings
- Fabrication of high pressure bends
- Erection

Material: X10CrWMoVNb9-2 (P92),10CrMo9-10, 13CrMo4-5, 16Mo3
Total Weight: 860 tonnes (pipes and supports)
Orderer: E.ON Kraftwerke GmbH
Contractor: Consortium E.ON Anlagenservice / Bilfinger VAM (each 50 %)
Period of time for realization: September 2007 – April 2011

Steam Power Plant Salzgitter „Power Plant 2010“ / Germany

Steam Power Plant Salzgitter „Power Plant 2010“ / Germany Show Reference
Steam Power Plant Salzgitter „Power Plant 2010“ / Germany

Scope of services:
Total BoP piping systems:

- Basic engineering
- detailengineering
- prefabrication
- supply and
- erection

Total weight pipes: approx. 1.300 tonnes
Material: P91, 16Mo3, P235GH, 1.4571, 10CrMo910
Orderer: Salzgitter Flachstahl GmbH
Period of time for realization: 2007 – 2010

PP Neurath „BoA power plant units 2/3“ Germany

PP Neurath „BoA power plant units 2/3“ Germany Show Reference
PP Neurath „BoA power plant units 2/3“ Generating unit F+G / Germany

Leistungsumfang Konsortium MCE ET/Bilfinger VAM:
MD-/ND-Rohrleitungssysteme

- Detail-Engineering
- Lieferung
- Vorfertigung und
- Montage LOS 2

Gewicht (ohne Armaturen): rd. 670 t
Gesamtlänge Rohrleitungen: 22.000 m
Dimension: bis DN 1200
Werkstoff: C-Stahl, Niro
Auftraggeber: RWE Power AG
Auftragnehmer: Konsortium Babcock Borsig Service GmbH / MCE Energietechnik GmbH / Bilfinger VAM
Projektlaufzeit: August 2007 – Ende 2009

PP Neurath „BoA power plant units 2/3“ Gener-
ating unit F+G / Germany

PP Neurath „BoA power plant units 2/3“ Gener-<br>ating unit F+G / Germany Show Reference
PP Neurath „BoA power plant units 2/3“ Generating unit F+G / Germany

Scope of services:
Main cooling water pipeline:

- Detailengineering
- Supply of pipes
- fittings
- compensators supports and valves
- Prefabrication
- Erection

Total Weight: 1.375 tonnes
Material: P235GH, P235TR2, P265CH, 1.4401
Orderer: RWE Power AG
Contractor: Consortium MCE Energietechnik / Bilfinger VAM
Period of time for realization: November 2006 – July 2010

ISKENDERUN - Coal Fired Power Plant / Turkey

ISKENDERUN - Coal Fired Power Plant / Turkey Show Reference
ISKENDERUN - Coal Fired Power Plant / Turkey

Scope of services:
Total BoP piping systems:

- Detailengineering
- prefabrication and
- supply of pipes, fittings, insulation, compensators, supports, spring hangers

Material: A 335-P91, A 335-P22, A 335-P11, A 691-1Cr, 15NiCu MoNb5,
1.4903, 1.4539,15 Mo3, Carbon steel, GRP, A 312 TP 304 L
Dimension: ½” up to 102”
Weight: 3.885 tonnes
Orderer: Siemens AG
Client: Isken
Period of time for realization: July 2000 – September 2003