Power Plant Andelsbuch / Austria Rehabilitation butterfly valves

Power Plant Andelsbuch / Austria Rehabilitation butterfly valves Show Reference
Power Plant Andelsbuch Rehabilitation butterfly valves

 

Client: Vorarlberger Illwerke AG

 

Project duration: April 2014 – January 2015

 

Scope of supply:

       Removal, rehabilitation, pressure- and funcional tests and reinstallation of

      2 butterfly valves DN 2000 / PN 10
    - Nominal pressure:         80 mwc
    - Test pressure:               120 mwc
    - Nominal flow:                 8,8 m³/s
    - Emergency break flow:  44 m³/s

       Change of both gate flaps, including improvement of the geometrical design of these flaps by means of CFD-analysis and explicit structural mecanical researches, using finite element calculation method

       Material: S460L, TSTE 500, 42CrMo4

       Total weight: approx. 16 tonnes

          

Power plant Bärenwerk / Austria Spherical valve

Power plant Bärenwerk / Austria Spherical valve Show Reference
Power plant Bärenwerk Spherical valve

Client: Salzburg AG

Project duration: 2014 – 2015

Scope of services:

       Supply, installation and comissioning

       2 spherical valves DN 600/ PN 40

       1 spherical valve DN 400 / PN 40

       Opening by oil hydraulic cylinders

       Closure by water hydraulic cylinders

       inclusive dismantling pipe, fitting flanges, by-pass with fittings,
minor pipingand complete hydraulic piping works

       Material: S355J2+N, 1.4313 QT780, stainless steel

       Total weight: approx. 48 tonnes

Linthal / Switzerland Turbine Installation

Linthal / Switzerland Turbine Installation Show Reference
Linthal Turbine Installation

Client: Alstom

Project duration: March 2014 – February 2016

Scope of Services:

·       Installation of 4 Francis-pump-turbines
including Spherical valves and compressed air equipment

·       Runner diameter:          Ø 4.180 mm

·       Output:                          250 MW each

·       Head:                             623 m

·       Speed:                           500 rpm

·       Flow rate:                       80 m³/s

Storage basin Silvretta Replacement obturators Obervermunt

Storage basin Silvretta Replacement obturators Obervermunt Show Reference
Storage basin Silvretta Replacement of obturators Obervermunt

Scope of services:
- Supply
-erection and
- commissioning of 3 butterfly valves including intermediate pipes, actuators and piping

DN 2200/1700/1000, PN 12/10/10
Material: 1.4314
Total weight: 75 tonnes
Client: Vorarlberger Illwerke AG
Project duration: October 2010 – May 2011

Power Plant Akocak / Turkey

Power Plant Akocak / Turkey Show Reference
Power Plant Akocak / Turkey

Scope of services:
- Installation of 2 Pelton turbines (5 nozzles) with vertical shaft including generators and spherical valves

Output: 40,8 MW
Head: 767,5 m
Speed: 750 rpm 
Orderer: VOITH Hydro AG
End customer: Akenerji Elektirk Üretim A.S. 
Period of time for realization: 2009 – 2010

Power Plant Limberg II / Austria

Power Plant Limberg II / Austria Show Reference
Power Plant Limberg / Austria

Scope of services:
- Installation of 2 spiral casing including inlet pipe, turbine pit steel liner and piping

Thickness: up to 200 mm
Total Weight: 92.000 kg 
Orderer: VOITH Hydro
End customer: VERBUND - Austrian Hydro Power AG
Period of time for realization: 2009 – 2010

Power Plant Wasserburg / Germany

Power Plant Wasserburg / Germany Show Reference
Power Plant Wasserburg / Germany

Scope of services:
- Pre- and main installation of 2 Kaplan bulb turbines including generator installation and hydraulic piping works

Diameter: 3.650 mm
Output: 6,2 MW
Head: 6,34 m
Speed: 136 rpm 
Orderer: Andritz Hydro
End customer: EON Wasserkraft 
Period of time for realization: 2008 – 2009

Power Plant Gerlos / Austria

Power Plant Gerlos / Austria Show Reference
Power Plant Gerlos / Austria

Scope of services:
- Installation of a vertical Pelton turbine (6 nozzles) including control system
- Installation of a spherical valve DN 1800 PN 70 including control system

Diameter: 2.600 mm
Output: 140 MW
Head: 610 m
Speed: 375 rpm 
Orderer: Andritz Hydro
End customer: VERBUND - Austrian Hydro Power AG
Period of time for realization: 2005 – 2007

Power Plant Ermenek / Turkey

Power Plant Ermenek / Turkey Show Reference
Power Plant Ermenek / Turkey

Scope of services:
- Installation of 2 Francis turbines with vertical shaft including auxiliaries and spherical valves
- Installation of 10 cranes

Diameter: 2.250 mm
Output: je 153,3 MW
Head: 327 m
Speed: 375 rpm 
Orderer: Andritz Hydro
End customer: DSI (General Directorate of State Hydraulic Works)
Period of time or realization: 2005 – 2008

Power Plant Borcka / Turkey

Power Plant Borcka / Turkey Show Reference
Power Plant Borcka / Turkey

Scope of services:
- Installation of 2 Francis turbines including auxiliaries equipment and inlet valves

Diameter: 5.100 mm
Output: á 153 MW
Head: 87 m
Speed: 136 rpm 
Orderer: Voith Hydro
End customer: DSI (General Directorate of State Hydraulic Works) 
Period of time for realization: 2003 – 2005

Power Plant Gottfrieding / Germany

Power Plant Gottfrieding / Germany Show Reference
Power Plant Gottfrieding / Germany

Scope of services:
- Pre- and main installation of 2 Kaplan bulb turbines including generator installation and hydraulic piping works

Diameter: 3.650 mm
Output: 6,2 MW
Head: 6,34 m
Speed: 136 rpm 
Orderer: Andritz Hydro
End customer: E.ON Wasserkraft 
Period of time for realization: 2008 – 2009

Power Plant Kopswerk II / Austria

Power Plant Kopswerk II / Austria Show Reference
Power Plant Kopswerk II / Austria

Scope of services:
- Installation of 3 Pelton turbines (6 nozzles) with vertical shaft including pipe works and
- installation of distribution pipes

Output: 152,5 MW
Head: 696,29 m
Speed: 500 rpm 
Orderer: VA TECH Escher Wyss
End customer: Vorarlberger Illwerke AG (VIW)
Period of time for realization: 2008

Power Plant Akköy / Turkey

Power Plant Akköy / Turkey Show Reference
Power Plant Akköy / Turkey

Scope of services:
- Installation of 3 Francis turbines with vertical shaft, generator installation and inlet valves

Diameter: 1.900 mm
Output: 34,5 MW
Head: 153 m
Speed: 428 rpm 
Orderer: VOITH Hydro
End customer: Akköy Enerji A.S. 
Period of time for realization: 2008

Power Plant Jebel Aulia / Sudan

Power Plant Jebel Aulia / Sudan Show Reference
Power Plant Jebel Aulia / Sudan

Scope of services:
- Installation of 80 Matrix Units in the existing irrigation bank at the White Nile

Total Output of the 80 Units: 30,4 MW
Orderer: Andritz Hydro
End customer: National Electric Corporation (NEC) 
Period of time for realization: 2004 – 2005

Power Plant Basochhu Lower Stage / Bhutan

Power Plant Basochhu Lower Stage / Bhutan Show Reference
Power Plant Basochhu Lower Stage / Bhutan

Scope of services:
- Installation of 2 Pelton turbines, governors, inlet spherical valves inclduing cooling water system, workshop equipment and powerhouse crane

Diameter: 900 mm
Output: 20,4 MW
Head: 480 m
Speed: 500 rpm 
Orderer: Andritz Hydro
End customer: Royal Government of Bhutan 
Period of time for realization: 2004 – 2005

Power Plant Muratli / Turkey

Power Plant Muratli / Turkey Show Reference
Power Plant Muratli / Turkey

Scope of services:
- Installation of 2 Francis turbines including auxiliaries equipment and inlet valves

Diameter: 4.750 mm
Output: á 65 MW
Head: 50 m
Speed: 120 rpm 
Orderer: Andritz Hydro
End customer: DSI (General Directorate of State Hydraulic Works) 
Period of time for realization: 2003 – 2005

Power Plant Roseires 4 / Sudan

Power Plant Roseires 4 / Sudan Show Reference
Power Plant Roseires 4 / Sudan

Scope of services:
- Installation of 1 Kaplan turbine
- change of turbine runner
- refurbishment of the wicket gate mechanism and
- auxiliary equipment

Diameter: 4.500 mm
Output: 45 MW 
Orderer: Andritz Hydro
End customer: National Electricity Corporation 
Period of time for realization: 2002

Power Plant Basochhu Upper Stage / Bhutan

Power Plant Basochhu Upper Stage / Bhutan Show Reference
Power Plant Basochhu Upper Stage / Bhutan

Scope of services:
- Installation of 2 Pelton turbines and 2 spherical valves

Diameter: 3.450 mm
Output: each 12,50 MW 
Orderer: Andritz Hydro
End customer: Royal Government of Bhutan 
Period of time for realization: 2000 – 2001

Power Plant Akosombo / Ghana

Power Plant Akosombo / Ghana Show Reference
Power Plant Akosombo / Ghana

Scope of services:
- General refurbishment of 6 Francis turbines
- change turbine runner
- modification stay vanes and wicket gates
- rehabilitation of auxiliary equipment

Diameter: 6.000 mm
Output: á 173 MW
Head: 69 m
Speed: 115 rpm 
Orderer: Andritz Hydro
End customer: Volta River Authority 
Period of time for realization: 1999 – 2004